Tweet
Custom Search
Back
TM-10-5411-232-13P Cargo Bed Cover (CBC) M105A2 Trailer Type II NSN
5411-01-467-3185
(Camouflage) NSN
5411-01-479-1925
(SAND) Manual
Up
Semi Trucks and related Equipment Training Manuals
TM-10-6640-233-10 Army Oil Analysis Program (AOAP) Mobile Laboratory SEM-Trailer Mounted NSN 6640-01-254-1699 Manual
Tm-10-6640-215-13
Chapter 1 Introduction
Hand Receipt (-Hr) Manuals
Safety, Care, And Handling
Safety, Care, And Handling
Safety, Care, And Handling - Continued
Nomenclature Cross-Reference List.
Section Ii. Equipment Description And Data
Equipment Purpose, Capabilities, And Features
Equipment Purpose, Capabilities, And Features - Continued
Equipment Purpose, Capabilities, And Features - Continued
Figure 1-2. Rear And Curbside Exterior
Location And Description Of Major Components - Continued
Figure 1-3. Front And Roadside Exterior
Figure 1-4. Petroleum Laboratory Interior (Sheet 1 Of 3)
Figure 1-4. Petroleum Laboratory Interior (Sheet 2 Of 3)
Figure 1-4. Petroleum Laboratory Interior (Sheet 3 Of 3)
Location And Description Of Major Components
Location And Description Of Major Components- Continued
Location And Description Of Major Components - Continued
Equipment Data
Equipment Data- Continued
Section Iii. Technical Principles Of Operation
Functional Description Of Petroleum Laboratory Support Systems - Continued
Functional Description Of Petroleum Laboratory Support Systems - Continued
Figure 1-5. Electrical System Functional Diagram
Functional Description Of Petroleum Laboratory Support Systems - Continued
Figure 1-6. Utility Systems Functional Diagram (Sheet 1 Of 3)
Figure 1-6. Utility Systems Functional Diagram (Sheet 2 Of 3)
Figure 1-6. Utility Systems Functional Diagram (Sheet 3 Of 3)
Functional Description Of Petroleum Laboratory Support Systems - Continued
Functional Description Of Petroleum Laboratory Unique Equipment
Functional Description Of Petroleum Laboratory Unique Equipment - Continued
Functional Description Of Petroleum Laboratory Unique Equipment - Continued
Functional Description Of Petroleum Laboratory Unique Equipment - Continued
Functional Description Of Petroleum Laboratory Unique Equipment - Continued
Functional Description Of Petroleum Laboratory Unique Equipment - Continued
Chapter 2 Operating Instructions
Figure 2-1. Petroleum Laboratory Exterior
Table 2-2. Main Power Panel
Figure 2-2. Main Power Panel
Table 2-2. Main Power Panel - Continued
Figure 2-3. Power Panel No. 2
Table 2-3. Power Panel No. 2
Figure 2-4. Lighting Controls And Indicators
Table 2-4. Lighting
Figure 2-5. Ecu Controls And Indicators
Table 2-5. Ecu Controls And Indicators
Figure 2-6. Purge System And Gas Alarm Controls And Indicators
Table 2-6. Purge System And Gas Alarm Controls And Indicators
Figure 2-7. Air Compressor Controls And Indicators
Table 2-7. Air System Controls And Indicators
Figure 2-8. Vacuum System Controls And Indicators
Table 2-8. Vacuum System Controls And Indicators
Figure 2-9. Water System Controls And Indicators
Table 2-9. Water System Controls And Indicators
Figure 2-10. Gum Bath System Controls And Indicators
Table 2-10. Gum Bath System Controls And Indicators
Table 2-10. Gum Bath System Controls And Indicators - Continued
Figure 2-11. Rvp Test System Controls And Indicators
Table 2-11. Rvp Test System Controls And Indicators
Figure 2-12. Sampling And Gaging Kit Controls And Indicators
Figure 2-13. Freezer Temperature Control
Figure 2-14. Oxygen And Nitrogen Cylinders With Gages And Regulators
Figure 2-15. Support Items Controls And Indicators
Table 2-12. Support Items Controls And Indicators - Continued
Alphabetical Index
Pmcs Procedures
Table 2-1. Operator Preventive Maintenance Checks And Services
Table 2-1. Operator Preventive Maintenance Checks And Services - Cont
Table 2-1. Operator Preventive Maintenance Checks And Services - Cont
Table 2-1. Operator Preventive Maintenance Checks And Services - Cont
Table 2-1. Operator Preventive Maintenance Checks And Services - Cont
Table 2-1. Operator Preventive Maintenance Checks And Services - Cont
Table 2-1. Operator Preventive Maintenance Checks And Services - Cont
Table 2-1. Operator Preventive Maintenance Checks And Services - Cont
Table 2-1. Operator Preventive Maintenance Checks And Services - Cont
Table 2-1. Operator Preventive Maintenance Checks And Services - Cont
Section Iii. Operation Under Usual Conditions
Assembly And Preparation For Use
Figure 2-16. Grounding Rod And Driver/Puller
Assembly And Preparation For Use - Continued
Figure 2-17. Power Input Panel
Assembly And Preparation For Use - Continued
Figure 2-18. Utilities Box
Figure 2-19. Water System Functional Diagram
Operating Procedures- Continued
Operating Procedures- Continued
Operating Procedures -Continued
Operating Procedures -Continued
Operating Procedures -Continued
Operating Procedures -Continued
Operating Procedures -Continued
Figure 2-20. Sampling And Gaging Kit
Figure 2-21. Anti-Icing Additive Test Kit
Operating Procedures -Continued
Preparation For Movement
Preparation For Movement- Continued
Section Iv. Operation Under Unusual Conditions
Chapter 3 Operator Maintenance
Table 3-1. Symptom Index
Table 3-1. Symptom Index - Continued
Table 3-2. Troubleshooting
Table 3-2. Troubleshooting- Continued
Table 3-2. Troubleshooting- Continued
Table 3-2. Troubleshooting- Continued
Table 3-2. Troubleshooting- Continued
Table 3-2. Troubleshooting- Continued
Table 3-2. Troubleshooting- Continued
Table 3-2. Troubleshooting- Continued
Table 3-2. Troubleshooting- Continued
Table 3-2. Troubleshooting- Continued
Table 3-2. Troubleshooting- Continued
Section Iii. Operator Maintenance Procedures
Figure 3-1. Fluorescent Lamp And Starter
Remove/Install Fluorescent Light Fixture Lamp And Starter
Remove/Install Purge Intake Door Filters.
Figure 3-2. Purge Door Filter
Remove Install Pressure Recording Gage
Figure 3-3. Pressure Recording Gage
Remove/Install Overpack Box Handle And Tiedown Rings.
Figure 3-4. Overpack Box Handle And Tiedown Ring
Remove/Install Aneroid Barometer.
Figure 3-5. Aneroid Barometer
Remove/Install Electric Still
Figure 3-6. Electric, Still
Remove/Install Electric Still
Section Iv. Administrative Storage
Chapter 4 Unit Maintenance
Section Ii. Service Upon Receipt
Inspecting And Preliminary Servicing Of Equipment Upon Receipt
Section Iii. Unit Preventive Maintenance Checks And Services (Pmcs)
Unit Preventive Maintenance Checks And Services- Continued
Table 4-1. Unit Preventive Maintenance Checks And Services
Table 4-1. Unit Preventive Maintenance Checks And Services
Table 4-1. Unit Preventive Maintenance Checks And Services
Table 4-1. Unit Preventive Maintenance Checks And Services
Section Iv. Unit Troubleshooting Procedures
Table 4-1. Symptom Index
Table 4-2. Troubleshooting
Table 4-2. Troubleshooting- Continued
Table 4-2. Troubleshooting- Continued
Table 4-2. Troubleshooting- Continued
Table 4-2. Troubleshooting- Continued
Table 4-2. Troubleshooting- Continued
Table 4-2. Troubleshooting- Continued
Section V. Unit Maintenance Procedures
Alphabetical Index
Figure 4-1. Utilities Box Repair
Repair Utilities Box
Repair Utilities Box
Figure 4-2. Power Entry Panel
Remove/Install Power Entry Panel
Figure 4-3. Propane Locker Vents
Remove/Install Propane Locker Vents
Figure 4-4. Fume Chamber And Gum Bath Vent Exhaust Door Assembly (Sheet 1 Of 2)
Figure 4-4. Fume Chamber And Gum Bath Vent Exhaust Door Assembly (Sheet 2 Of 2)
Remove/Install Fume Chamber And Gum Bath Vent Exhaust Door
Remove/Install Power Cable
Remove/Install Light Ballast
Figure 4-5. Light Ballast
Remove/Install Emergency Light Ballast
Remove/Install Emergency Light Ballast Box
Figure 4-6. Emergency Lights Ballast
Remove/Install Components Of Main Power Panel
Figure 4-7. Main [Power Panel Components
Figure 4-8. Main Circuit Breaker
Remove/Install Components Of Main Power Panel - Continued
Remove/Install Components Of Main Power Panel- Continued
Remove/Install Explosive Proof Distribution Box A3 Components
Figure 4-9. Explosion Proof Distribution Box A3
Remove/Install Explosive Proof Distribution Box A3 Components - Continued
Remove/Install Power Panel Number 2 Components
Figure 4-10. Power Panel No. 2 Components
Remove/Install Power Panel Number 2 Components - Continued
Remove/Install Explosive Proof Distribution Box A3 Components
Figure 4-11. Explosive Proof Distribution Box A13
Remove/Install Explosive Proof Distribution Box A13 Components - Continued
Remove/Install Wall Switches
Figure 4-12. Replace Wall Switch
Remove/Install Wall Switches - Continued.
Figure 4-13. Blackout Microswitch
Remove/Replace Blackout Microswitch -Continued
Figure 4-14. Receptacles
Remove/Install Receptacles -Continued
Figure 4-15. Ecu Remote Control
Remove/Install Environmental Control Unit Remote Controls - Continued
Figure 4-16. Replace Motor Controller
Remove/Install Environmental Control Unit 18,000 Btu
Figure 4-17. Environmental Control Unit
Remove/Install Environmental Control Unit 18,000 Btu - Continued
Repair Purge Intake Doors
Figure 4-18. Purge Intake/Exhaust Door
Repair Purge Intake Doors- Continued
Repair Purge Intake Doors- Continued
Remove/Install Purge Intake Door Damper Motor
Figure 4-19. Purge Intake Door Damper Motor
Remove/Install Purge Intake Door Damper Motor - Continued.
Remove/Install Ecu Intake Damper/Motor
Figure 4-20. Ecu Intake Jumper
Remove/Install Ecu Intake Damper/Motor - Continued
Repair Purge Exhaust Door Machinery Room
Figure 4-21. Machinery Room Purge Exhaust Damper Motor
Remove/Install Machinery Room Exhaust Damper Motor- Continued
Repair Purge Exhaust Door, Curbside
Figure 4-22. Curbside Exhaust Damper Motor
Remove/Install Curbside Exhaust Damper Motor- Continued
Remove/Replace Components Of Air System - Continued
Figure 4-23. Air Compressor
Figure 4-24. Air Tank
Remove/Replace Components Of Air System- Continued
Figure 4-25. Flow Control Devices
Figure 4-26. Piping System
Remove/Replace Components Of Air System- Continued
Remove/Install Components Of Vacuum System -Continued
Figure 4-27. Vacuum Pump
Remove/Install Components Of Vacuum System - Continued
Remove/Install Manometer Air Regulator Valve
Figure 4-28. Manometer Air Regulator
Remove/Install Components Of Water System.
Figure 4-29. Water Filter
Figure 4-30. Water Pressure Switch
Remove/Install Components Of Water System - Continued
Figure 4-31. Sink Components
Remove/Install Components Of Water System - Continued
Remove/Install Components Of Water System-Continued
Figure 4-32. Gas Alarm Unit
Remove/Install Gas Alarm System - Continued
Figure 4-33. Gas Alarm Detector
Remove/Install Gas Alarm System- Continued.
Remove/Install Cabinets, Stool Storage Bracket And Lockers
Figure 4-34. Storage Cabinet Latch, Lock, And Hinge
Figure 4-35. Stainless Steel Sink
Figure 4-36. Steel Storage Locker
Figure 4-37. Desiccating Cabinet
Remove/Install Cabinets, Stool, Storage Bracket And Lockers - Continued
Figure 4-38. Stool And Bracket
Figure 4-39. Steel Bookcase
Remove/Install Cabinets, Stool, Storage Bracket And Lockers - Continued
Figure 4-40. Analytical Balance
Remove/Install The Analytical Balance And Vibration Damping Support - Continued.
Remove/Install Gum Bath/Fume Hood Exhaust Blower Hoses - Continue
Figure 4-41. Rvp Bath
Remove/Install The Rvp Testing System - Continued.
Figure 4-42. Rvp Test Bomb
Figure 4-43. Rvp Gages
Figure 4-44. Manometer
Remove/Install The Rvp Testing System - Continued
Remove/Install Kinematic Viscosity Baths
Figure 4-45. Kinematic Viscosity Bath
Remove/Install The Centrifuge
Figure 4-46. Centrifuge
Remove/Install The Distillation Test Apparatus
Figure 4-47. Distillation Test Apparatus
Remove/Install The Distillation Test Apparatus- Continued
Remove/Install Oxidation Stability Bath
Figure 4-48. Oxidation Stability Bath
Remove/Install Oxidation Stability Bath- Continued
Figure 4-49. Laboratory Ovens
Remove/Install Laboratory Ovens - Continued
Figure 4-50. Burn-Out Furnace
Remove/Install Burn-Out Furnace - Continued
Figure 4-51. Explosion Proof Refrigerator
Remove/Install The Explosion Proof Refrigerator-Continued
Remove/Install Jet Fuel Thermal Stability Tester, Jftot - Continued
Figure 4-52. Jet Fuel Thermal Oxidation Tester
Remove/Install Gas Cylinders And Gas Regulator Valves
Figure 4-53. Gas Cylinder/Gas Regulator Valve
Remove/Install Gas Cylinders And Gas Regulator Valves - Continued
Remove/Install Water Level Regulator - Continued
Figure 4-54. Water Level Regulator
Remove/Install Roadside Stowage Box
Figure 4-55. Roadside Stowage Box
Remove/Install Roadside Stowage Box - Continued
Remove/Install Roadside Stowage Box- Continued
Figure 4-56. Curbside Stowage Box
Remove/Install Curbside Stowage Box- Continued
Remove/Install Curbside Stowage Box -Continued
Remove/Install Gfi Indicating Switches
Figure 4-57. Gfi Indicating Switches
Remove/Install Gfi Indicating Switches - Continued
Chapter 5 Direct Support Maintenance
Alphabetical Index - Continued
Figure 5-1. Water Pump Removal And Installation
Remove/Install Water Tank
Remove/Install Water Tank - Continued
Remove/Install Water Tank Drain
Remove/Install Surge Tank
Remove Install Water Chiller
Figure 5-5. Water Chiller Removal And Installation
Remove/Install Control Devices (Water System)
Figure 5-6. Water System Control Devices Removal And Installation
Remove/Install System Piping (Typical) Water System)
Figure 5-7. Water System Piping Removal And Installation
Remove/Install Water Heater
Figure 5-8. Water Heater Removal And Installation
Remove/Install Thermostat And Heating Element
Figure 5-9. Thermostat And Heating Element Removal And Installation
Installation
Remove/Install Sump Pump
Figure 5-10. Sump Pump Removal
Remove/Install Sump Pump - Continued
Figure 5-11. Sump Pump Installation
Remove/Install Gum Content Test Bath
Figure 5-12. Gum Content Bath Removal
Remove/Install Gum Content Test Bath- Continued
Figure 5-13. Gum Content Bath Installation
Boiler Low Water Cutoff Pump Control
Figure 5-14. Boiler Low Water Cutoff Pump Control Removal And Installation
Remove/Install Boiler Low Water Pump
Figure 5-15. Boiler Low Water Pump Removal And Installation
Remove/Install Electric Steam Boiler Sight Glass
Figure 5-16. Electric Steam Boiler Sight Glass Removal And Installation
Remove/Install Operating/Limit Control Switches
Figure 5-17. Operating/Limit Control Switch Removal And Installation
Remove/Install Electric Steam Boiler
Figure 5-18. Electric Steam Boiler Removal
Remove/Install Electric Steam Boiler - Continued
Figure 5-19. Electric Steam Boiler Installation
Remove/Install Flow Control Devices (Gum Bath System)
Figure 5-20. Gum Bath System Flow Control Devices Removal And Installation
Remove/Install High Pressure Steam Boiler
Figure 5-21. High Pressure Steam Boiler Removal
Remove/Install High Pressure Steam Boiler - Continued
Figure 5-22. High Pressure Steam Boiler Installation
Remove/Install Pyrometer Indicator/Control
Figure 5-23. Pyrometer Indicator/Control Removal And Installation
Remove/Install Air/Steam Flow Rate Indicator Meters
Figure 5-24. Air/Steam Flow Rate Indicator Meters Removal And Installation
Remove/Install Gum Bath Vent/Fume Vent Blower And Motor
Figure 5-25. Gum Bath Vent/Fume Vent Blower And Motor Removal And Installation
Remove/Install Freezer (Ice Cube Maker)
Figure 5-26. Freezer Removal And Installation
Appendix A References
Appendix A References - Cont
Appendix B Maintenance Allocation Chart
Maintenance Functions
Explanation Of Columns In Tool And Test Equipment Requirements, Section Ill
Section Ii. Maintenance Allocation Chart
Section Ii. Maintenance Allocation Chart
Section Ii. Maintenance Allocation Chart
Section Ii. Maintenance Allocation Chart
Section Ii. Maintenance Allocation Chart
Section Ii. Maintenance Allocation Chart
Section Ii. Maintenance Allocation Chart
Section Ii. Maintenance Allocation Chart
Section Ii. Maintenance Allocation Chart
Section Ii. Maintenance Allocation Chart
Section Ii. Maintenance Allocation Chart
Section Ii. Maintenance Allocation Chart
Section Ii. Maintenance Allocation Chart
Appendix C Components Of End Item And Basic Issue Items List
Section Ii. Components Of End Item - Continued
Equipment Location Curbside
Section Ii. Components Of End Item - Continued
Equipment Location Front Lab Wall
Section Ii. Components Of End Item - Continued
Equipment Location Front Lab Wall
Section Ii. Components Of End Item - Continued
Equipment Location Road Side
Section Ii. Components Of End Item - Continued
Equipment Location Road Side
Section Ii. Components Of End Item - Continued
Equipment Location Road Side
Section Iii. Basic Issue Items
Storage Road Side
Section Iii. Basic Issue Items - Continued
Storage Road Side
Section Iii. Basic Issue Items - Continued
Storage Road Side
Section Iii. Basic Issue Items - Continued
Storage Road Side
Section Iii. Basic Issue Items - Continued
Storage Road Side
Section Iii. Basic Issue Items - Continued
Storage Road Side
Section Iii. Basic Issue Items - Continued
Storage Road Side
Section Iii. Basic Issue Items - Continued
Storage Road Side
Section Iii. Basic Issue Items - Continued
Storage Road Side
Section Iii. Basic Issue Items - Continued
Storage Road Side
Section Iii. Basic Issue Items - Continued
Storage Road Side
Section Iii. Basic Issue Items - Continued
Equipment Location Roadside
Section Iii. Basic Issue Items - Continued
Storage Curbside
Section Iii. Basic Issue Items - Continued
Storage Curbside
Section Iii. Basic Issue Items - Continued
Storage Curbside
Section Iii. Basic Issue Items - Continued
Storage Curbside
Section Iii. Basic Issue Items - Continued
Storage Curbside
Section Iii. Basic Issue Items - Continued
Section Iii. Basic Issue Items - Continued
Section Iii. Basic Issue Items - Continued
Storage Curbside
Section Iii. Basic Issue Items - Continued
Storage Curbside
Section Ii. Components Of End Item - Continued
Storage Curbside
Section Ii. Components Of End Item - Continued
Storage Curbside
Section Ii. Components Of End Item - Continued
Storage Curbside
Section Ii. Components Of End Item - Continued
Storage Curbside
Section Ii. Components Of End Item - Continued
Storage Curbside
Section Ii. Components Of End Item - Continued
Storage Curbside
Section Ii. Components Of End Item - Continued
Storage Curbside
Section Ii. Components Of End Item - Continued
Storage Curbside
Section Ii. Components Of End Item - Continued
Storage Curbside
Section Iii. Basic Issue Items - Continued
Storage Curbside
Section Iii. Basic Issue Items - Continued
Storage Curbside
Section Iii. Basic Issue Items - Continued
Storage Curbside
Section Iii. Basic Issue Items - Continued
Storage Curbside
Section Iii. Basic Issue Items - Continued
Storage Curbside
Appendix D. Additional Authorization List (Aal)
Appendix E Expendable/Durable Items List
Section Ii. Expendable/Durable Items List - Continued
Section Ii. Expendable/Durable Items List - Continued
Section Ii. Expendable/Durable Items List - Continued
Section Ii. Expendable/Durable Items List - Continued
Section Ii. Expendable/Durable Items List - Continued
Section Ii. Expendable/Durable Items List - Continued
Section Ii. Expendable/Durable Items List - Continued
Section Ii. Expendable/Durable Items List - Continued
Section Ii. Expendable/Durable Items List - Continued
Section Ii. Expendable/Durable Items List - Continued
Section Ii. Expendable/Durable Items List - Continued
Section Ii. Expendable/Durable Items List - Continued
Section Ii. Expendable/Durable Items List - Continued
Section Ii. Expendable/Durable Items List - Continued
Section Ii. Expendable/Durable Items List - Continued
Section Ii. Expendable/Durable Items List - Continued
Section Ii. Expendable/Durable Items List - Continued
Section Ii. Expendable/Durable Items List - Continued
Section Ii. Expendable/Durable Items List - Continued
Section Ii. Expendable/Durable Items List - Continued
Appendix F. Illustrated List Of Manufactured Items
Fabrication Instructions
Figure F-3. Chromium Nickel Steel
Figure F-5. Gasket, Rubber
Figure F-7. Vacuum Hose
Figure F-10. Cellular Rubber And Rubber Gasket
Figure F-12. Metallic Tube
Index
Index - Cont
Index - Cont
Index - Cont
Index - Cont
Index - Cont
Index - Cont
Figure Fo-1. Petroleum Laboratory Electrical Schematic
Figure Fo-1. Petroleum Laboratory Electrical Schematic - Cont
Figure Fo-1. Petroleum Laboratory Electrical Schematic - Cont
Figure Fo-1. Petroleum Laboratory Electrical Schematic - Cont
Figure Fo-1. Petroleum Laboratory Electrical Schematic - Cont
Figure Fo-1. Petroleum Laboratory Electrical Schematic - Cont
Figure Fo-1. Petroleum Laboratory Electrical Schematic - Cont
Figure Fo-1. Petroleum Laboratory Electrical Schematic - Cont
Figure Fo-1. Petroleum Laboratory Electrical Schematic - Cont
Figure Fo-1. Petroleum Laboratory Electrical Schematic - Cont
Figure Fo-1. Petroleum Laboratory Electrical Schematic - Cont
Approximate Conversion Factors
Privacy Statement
-
Copyright Information.
-
Contact Us
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business