TM 10-6640-215-13
Table 4-2. Troubleshooting - continued
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
25.
LOW PRESSURE BOILER FAILS TO OPERATE (POWER AVAILABLE).
Step 1. Check water supply to the boiler.
Water is available.
Step 2. Check output valve line up.
Line up is correct.
If boiler still fails to operate, notify direct support maintenance to replace low pressure boiler.
26.
HIGH PRESSURE BOILER FAILS TO OPERATE (POWER AVAIL ABLE).
Check system input/output valve line up.
If valve line up is correct, notify direct support maintenance to replace boiler.
27.
RVP BATH FAILS TO OPERATE (POWER AVAILABLE).
Troubleshoot RVP bath in accordance with TM 10-6640-226-13&P. If problem cannot be resolved, replace the
RVP bath. See paragraph 4-44.
28.
MANOMETER FAILS TO OPERATE (NO PHYSICAL DAMAGE APPARENT).
Replace the manometer. See paragraph 4-44.
29.
KINEMATIC VISCOSITY TEST BATH FAILS TO OPERATE (POWER AVAILABLE).
Troubleshoot bath in accordance with TM 10-6630-239-13&P. If problem cannot be resolved, replace the
kinematic viscosity test bath. See paragraph 4-45.
30.
CENTRIFUGE FAILS TO OPERATE (POWER AVAILABLE).
Troubleshoot centrifuge in accordance with TM 10-6640-230-13&P. If problem cannot be resolved, replace the
centrifuge. See paragraph 4-46.
31.
DISTILLATION TEST APPARATUS FAILS TO OPERATE (POWER AVAILABLE).
Troubleshoot failed unit in accordance with TM 10-6630-233-13&P. If problem cannot be resolved, replace the
failed unit. See paragraph 4-47.
4-18
|
|