TM 10-6640-215-13
4-56.
REMOVE/INSTALL CURBSIDE STOWAGE BOX -continued.
b.
Rivet the hinges to the door panel. Place door panel with hinge into position on the stowage box and attach
with rivets.
c.
Position new latch on door panel and align holes. If a new door panel is being used, place the latch into
position and mark hole locations then drill out the holes.
d.
Position latch striker on the box base.
e.
Rivet the latch striker to the box base.
f.
Position hasp on the door panel. If a new door panel is being used, place the hasp in position and mark hole
locations then drill out the holes.
g.
Rivet the hasp to the door panel.
h.
Position the new hasp striker on the box base.
i.
Rivet the hasp striker to the box base.
2.
Install Stowage Box Hanger Channels. See figure 4-56.
a.
Place one hex head cap screw into position towards center of the van support that will receive the front
hanger channel.
b.
Position the front hanger channel and attach using flat washer, lockwasher and nut. This will support the
hanger channel so that the remaining five lockwashers, flat washers, and nuts can be secured in place.
c.
Place one hex head cap screw into position towards center of the van support that will receive the rear
hanger channel.
d.
Position the rear hanger channel and attach using flat washer, lockwasher and nut. This will support the
hanger channel so that the remaining three lockwashers, flat washers, and nuts can be secured in place.
3.
Install Curbside Stowage Box. See figure 4-56.
a.
Place one person on each end of the stowage box and lift box into position on front and rear hanger
channels.
b.
Attach stowage box to hanger channels with pins and then secure pins with safety pins.
4-151
|
|