TM 10-6640-215-13
5-22. REMOVE/INSTALL HIGH PRESSURE STEAM BOILER - continued.
j.
Tag for reconnection and disconnect two wires and conduit from bottom of boiler.
k. Remove four screws, flat washers, grommets and temperature control box from boiler.
l.
Remove pipe fittings and relief valve from boiler.
Figure 5-21. High Pressure Steam Boiler Removal
5-43
|
|