TM 10-6640-215-13
4-20. REMOVE/INSTALL EXPLOSIVE PROOF DISTRIBUTION BOX A3
COMPONENTS.
This task covers:
a.
Disassembly
c. Installation
b.
Removal
d. Assembly
INITIAL SET-UP:
Tools Required
General Mechanics Tool Kit, (Appendix B, Section III, Item 2)
Materials/Parts Required
Lockwashers, (Appendix F)
General Safety Instructions
WARNING
ELECTRICAL SHOCK
Before performing any maintenance actions on electrical equipment, ensure all
electrical power has been turned off. Death or serious injury may occur from failure
to do this.
DISASSEMBLY
Disassemble Explosive Proof Distribution Box A3. See figure 4-9.
a.
Open main circuit breaker A I CB I and turn generator off.
NOTE
Mark distribution box cover left side before removing.
b.
Remove six screws from outside metal panel to gain access to distribution box which is located below main
power panel.
c.
Remove twenty eight mounting screws, and flat washers attaching cover to distribution box and remove
cover.
REMOVAL.
1.
Remove Timer Relay A3K 1. See figure 4-9.
Relay A3K I is a plug-in type relay and is removed by simply lifting relay from socket.
NOTE
The procedure for removing the remaining four control relays is identical to those outlined in the following steps.
2.
Remove Control Relay. See figure 4-9.
a.
Loosen terminal screws on relay, disconnect electrical leads and tag for reconnection.
4-43
|
|