TM 10-6640-215-13
5-19. REMOVE/INSTALL OPERATING/LIMIT CONTROL SWITCHES - continued
f.
At POWER PANEL No. 2, set circuit breaker A15CB5 to ON.
g.
Prepare and operate water system using internal water tank as source in accordance with procedures listed in
paragraph 2-8.
h.
Inspect for leaks and check for proper operation.
Figure 5-17. Operating/Limit Control Switch Removal and Installation
5-35
|
|