Custom Search
 
  
 


TM 9-2330-330-14&P
HOSE REEL CABINET REPLACEMENT
THIS WP COVERS:
Removal, Installation, Follow-On Tasks
INITIAL SETUP:
Maintenance Level
Equipment Conditions
Direct and General Support
Semitrailer disconnected from prime mover (refer
to
Semitrailer grounded (refer to WP 0007 00)
Materials/Parts
Negative terminal disconnected from battery (refer
Self-locking nuts (22) (item 87, WP 0175 00)
Self-locking nuts (9) (item 88, WP 0175 00)
Volumetric meters removed (refer to WP 0127 00)
Hose reels removed (refer to WP 0157 00)
Tools and Special Tools
P and R valves removed (refer to WP 0129 00)
Tool kit, general mechanic's (item 4, WP 0171 00)
Roadside hose tubes removed (refer to
Forklift truck (item 1, WP 0171 00)
Optic socket box removed (refer to WP 0050 00)
Remove piping in hose reel cabinet (refer to
REMOVAL
1.
Remove eight self-locking nuts (2), washers (3), bolts (4), and two electrical junction boxes (1)
behind hose reel cabinet (5). Discard self-locking nuts.
2.
Remove self-locking nut (6), washer (7), and bracket (8) from cabinet (5). Discard self-locking nut.
0156 00-1



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business