Custom Search
 
  
 


TM 9-2330-330-14&P
P AND R VALVES REPLACEMENT
THIS WP COVERS:
Removal, Installation, Follow-On Tasks
INITIAL SETUP:
Maintenance Level
Tools and Special Tools
Organizational
Tool kit, general mechanic's (item 4, WP 0171 00)
Materials/Parts
Equipment Conditions
Gaskets (2) (item 81, WP 0175 00)
Semitrailer disconnected from prime mover (refer
Lockwashers (8) (item 91, WP 0175 00)
Seals (4) (item 85, WP 0175 00)
Semitrailer grounded (refer to WP 0007 00)
Self-locking nuts (12) (item 93, WP 0175 00)
Semitrailer fuel tank drained (refer to WP 0007 00)
Negative terminal disconnected from battery (refer
REMOVAL
NOTE
There are two valves and they are replaced the same way.
This procedure covers the R valve.
1.
Remove four nuts (9), lockwashers (8), gasket (10), and pipe (7) from meter (1). Discard
lockwashers and gasket.
2.
Remove 6 self-locking nuts (2), 12 washers (3), 6 bolts (4), 2 seals (5), and valve (6). Discard self-
locking nuts and seals.
0129 00-1



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business