Custom Search
 
  
 


TM 9-2330-329-14&P
ENGINE HEAT SHIELD REPLACEMENT
THIS WP COVERS:
Removal, Installation, Follow-On Tasks
INITIAL SETUP:
Maintenance Level
Tools and Special Tools
Direct and General Support
Tool kit, general mechanic's (item 4, WP 0156 00)
Materials/Parts
Personnel Required
Self-locking nuts (8) (item 88, WP 0160 00)
Two
Self-locking nuts (2) (item 89, WP 0160 00)
Equipment Conditions
Semitrailer disconnected from prime mover (refer
Semitrailer grounded (refer to WP 0007 00)
Semitrailer fuel tank drained (refer to WP 0007 00)
Two hose tubes loosened at engine cabinet (refer
Air cleaner and hose removed (refer to
Pump tubing removed from top of pump (refer to
Muffler plate and muffler removed (refer to
REMOVAL
1.
Remove 8 self-locking nuts (2), 16 washers (3), and 8 bolts (4) from top right and left edges of heat
shield (1). Discard self-locking nuts.
0143 00-1



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business