TM 9-2330-329-14&P
PUMP TUBING REPLACEMENT
THIS WP COVERS:
Removal, Installation, Follow-On Tasks
INITIAL SETUP:
Maintenance Level
Tools and Special Tools
Organizational
Tool kit, general mechanic's (item 4, WP 0156 00)
Materials/Parts
Equipment Conditions
Gaskets (2) (item 142, WP 0160 00)
Semitrailer disconnected from prime mover (refer
Seals (4) (item 129, WP 0160 00)
to WP 0007 00)
Lockwashers (16) (item 13, WP 0160 00)
Semitrailer grounded (refer to WP 0007 00)
Semitrailer fuel tank drained (refer to WP 0007 00)
Negative terminal disconnected from battery (refer
to WP 0007 00)
REMOVAL
1.
Remove four nuts (4), bolts (5), two split couplings (2), and seals (3) from pipe (1). Discard seals.
2.
Remove eight bolts (8), lockwashers (9), gasket (7), and pipe (1) from pump (6). Discard
lockwashers and gasket.