Custom Search
 
  
 


TM 9-2330-329-14&P
ENGINE AND PUMP CABINET FRAME REPLACEMENT--Continued
0142 00
23.
Install split coupling (6), new seal (7), two nuts (4), and bolts (5) at inlet T (8).
24.
Install four bolts (10), eight washers (11), and four new self-locking nuts (12) to side and bottom of
bottom loading support bracket (9).
25.
Install two washers (2) and new self-locking nuts (1) to U-bolt (3).
FOLLOW-ON TASKS
1.
Install muffler plate and muffler (WP 0109 00).
2.
Install alternator (WP 0110 00).
3.
Install air cleaner and hose (WP 0105 00).
4.
Install two hose tubes at engine cabinet (WP 0088 00).
5.
Install brake interlock valve (WP 0069 00).
6.
Install static reel (WP 0084 00).
7.
Install fuel tank (WP 0102 00).
8.
Install fuel lines (WP 0103 00).
9.
Install optic socket box (WP 0048 00).
10.
Install batteries (WP 0053 00).
11.
Disconnect semitrailer grounding cables (WP 0007 00).
END OF TASK
0142 00-17/18 blank



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business