Tweet |
Custom Search
|
|
|
||
TM 9-2330-326-14&P
This Task Covers:
a. Removal
b. Installation
c. Follow-On Tasks
Initial Setup:
Tools and Special Tools:
Equipment Conditions:
Tool kit, general mechanic's (Item 4, Appendix B-3)
Landing legs down
Semitrailer disconnected from prime mover
Tires chocked
ECU valve removed (Paragraph 6-11)
Ground boards emplaced
WARNING
Wear protective goggles when underneath semitrailer and
opening drain valve and avoid the air stream. Failure to do so
could result in injury to personnel.
Insure all pressurized air has been drained from system.
General Procedure:
a. Removal.
1.
Remove four locknuts (2), four washers (4), four hex screws (5), two rubber pads (3), and front
air reservoir (1) from mounts. Discard locknuts.
2.
Remove drain valve (7) and pipe plug (8) from front air reservoir (1).
3.
Remove four locknuts (2), four washers (4), four hex screws (5), two rubber pads (3), and rear
air reservoir (6) from mounts. Discard locknuts.
4.
Remove two pipe plugs (9), drain valve (7), and pipe plug (8) from rear air reservoir (6).
|
||