Custom Search
 
  
 


TM 9-2330-326-14&P
b. Installation.
1.
Install two pipe plugs (9), drain valve (7), and pipe plug (8) to rear air reservoir (6).
2.
Install rear air reservoir (6) to mounts using four hex screws (5), four washers (4), two rubber
pads (3), and four new locknuts (2).
3.
Install drain valve (7) and pipe plug (8) to front air reservoir (1).
4.
Install front air reservoir (1) to mounts using four hex screws (5), four washers (4), two rubber
pads (3), and four new locknuts (2).
c.
Follow -On Tasks.
1.
Install ECU control valve on rear tank (Paragraph 6-11).
2.
Connect semitrailer to prime mover.
3.
Remove tire chocks.
4.
Raise landing legs.
5.
Remove/store ground boards.
6.
Pressurize system.
7.
Check for air leaks.
8.
Road test to insure safe operation.
6-48



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business