Tweet |
Custom Search
|
|
|
||
TM 9-2330-326-14&P
This Task Covers:
a. Removal
b. Installation
c. Follow-On Tasks
Initial Setup:
Tools and Special Tools:
Materials:
Tool kit, general mechanic's (Item 4, Appendix B-3)
Dielectric grease (Item 34, Appendix F)
Compound, Antiseize (Item 4, Appendix F)
Equipment Condition
References:
Landing legs down
Appendix H-16
Semitrailer disconnected from prime mover
Electrical Schematic, Section 6, Page 6-6
Tires chocked
Ground boards emplaced
WARNING
Disconnect all electrical power before performing any maintenance
on the electrical system. Failure to do so could result in injury.
NOTE
There are four taillights and they are removed and installed the
same way. This procedure covers one taillight.
For detailed procedures and/or information see referenced
"H" Section.
General Procedure:
a. Removal.
1. Disconnect taillight connector from wiring harness connector behind bulkhead.
2. Disconnect ground wire from taillight behind bulkhead.
NOTE
Only the two outer taillights have ground wires.
3. Remove three self-tapping screws (2) and taillight (1). Discard screws.
|
||