Custom Search
 
  
 


TM 9-2330-331-14&P
BULKHEAD AND STOWAGE RACK ASSEMBLY REPLACEMENT
INITIAL SETUP:
Equipment Conditions
Materials/Parts
Ground Boards Emplaced
Locknuts (WP 0080 00-30)
Landing Legs Down
Tires Chocked
Semitrailer Disconnected from Prime Mover
Personnel
Sideboards/Stakes Removed from Bulkhead
Two
and Stowage Racks
Tools/Test Equipment
General Mechanic's Tool Kit (WP 0077 00-9)
REMOVAL
WARNING
Bulkhead assembly weighs 250 lbs. (113.4 kg). Failure to secure
bulkhead during replacement may cause serious injury or death.
1. Remove two locknuts (5), washers (6), and bolts (7), from curbside and roadside bulkhead
assembly (1). Discard locknuts and bolts.
2. Remove four locknuts (4), eight washers (3), and four bolts (2). Discard locknuts and bolts.
3. Carefully lay the bulkhead (1) on the deck of the trailer.
4. Remove bulkhead (1) from trailer deck.
1
2
3
3
4
7
65
Figure 1. Bulkhead and Stowage Rack



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business