TM 9-2330-331-14&P
0054 00
SLING PROVISION ASSEMBLY MAINTENANCE - Continued
INSTALLATION
NOTE
Step 3 is only required if pin (6) needs to be replaced.
1. Install bolt (5), washer (4), and new locknut (3) to frame.
2. Install lift eye (8) in siderail (2) with screw (7) and new locknut (1).
3. Install pin (6) in siderail (2).
3
1
4
2
5
8
6
7
Figure 1. Sling Provision
END OF WORK PACKAGE
0054 00-2