| Tweet | 
 
  
    Custom Search
   
 | 
      
         | 
 
       | 
		||
        ![]() TM 9-2330-331-14&P 	 
SLING PROVISION ASSEMBLY MAINTENANCE 
INITIAL SETUP: 
Equipment Conditions	 
Materials/Parts 
 Wheels Chocked	 
 Locknut (WP 0080 00-24) 
 Locknut (WP 0080 00-24) 
Tools/Test Equipment	 
Personnel 
 General Mechanic'sTool Kit (WP 0077 00-9) 
 Two 
WARNING 
Sling provision weighs 97 lbs. (44 kgs). Use caution when lifting and 
moving to avoid serious injury. 
NOTE 
	 Step 3 is only required if pin (6) needs to be replaced. 
	 There are four sling provisioning locations on the trailer. Lift eye replacement 
is the same for all. 
REMOVAL 
1. Remove pin (6) from siderail (2). 
2. Remove locknut (1), screw (7), and lift eye (8) from siderail (2). Discard locknut. 
3. Remove locknut (3), washer (4), pin (6) and bolt (5) from frame. Discard locknut. 
3 
1 
4 
2 
5 
8 
6 
7 
Figure 1. Sling Provision 
 | 
			||
![]()  | 
		||