Tweet |
Custom Search
|
|
|
||
TM 9-2330-331-14&P
SLING PROVISION ASSEMBLY MAINTENANCE
INITIAL SETUP:
Equipment Conditions
Materials/Parts
Wheels Chocked
Locknut (WP 0080 00-24)
Locknut (WP 0080 00-24)
Tools/Test Equipment
Personnel
General Mechanic'sTool Kit (WP 0077 00-9)
Two
WARNING
Sling provision weighs 97 lbs. (44 kgs). Use caution when lifting and
moving to avoid serious injury.
NOTE
Step 3 is only required if pin (6) needs to be replaced.
There are four sling provisioning locations on the trailer. Lift eye replacement
is the same for all.
REMOVAL
1. Remove pin (6) from siderail (2).
2. Remove locknut (1), screw (7), and lift eye (8) from siderail (2). Discard locknut.
3. Remove locknut (3), washer (4), pin (6) and bolt (5) from frame. Discard locknut.
3
1
4
2
5
8
6
7
Figure 1. Sling Provision
|
||