Custom Search
 
  
 


TM 9-2330-331-14&P
AIR RESERVOIRS REPLACEMENT
INITIAL SETUP:
Equipment Conditions
Materials/Parts
Ground Boards Emplaced
Sealant, Silicone (WP 0086 00-3)
Landing Legs Down
Locknuts (WP 0080 00-14)
Tires Chocked
Semitrailer Disconnected from Prime Mover
Spring Valve Removed (WP 0043 00-2)
Tools /Test Equipment
General Mechanic's Tool Kit (WP 0077 00-9)
WARNING
Wear protective goggles when underneath semitrailer and opening
drain valve. Avoid the air stream. Ensure all pressurized air has
been drained from system. Failure to do so could result in injury
to personnel.
CAUTION
Air reservoirs weigh 30 lbs (14 kgs). Use caution during removal and
replacment procedures.
NOTE
This procedure is for one air reservoir. All reservoirs are removed in
the same way.



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business