Tweet |
Custom Search
|
|
|
||
TM 9-2330-330-14&P
F, E, AND B VALVES REPAIR
THIS WP COVERS:
Disassembly, Cleaning and Inspection, Assembly, Follow-On Tasks
INITIAL SETUP:
Maintenance Level
Tools and Special Tools
Direct and General Support
Tool kit, general mechanic's (item 4, WP 0171 00)
Materials/Parts
Equipment Conditions
Compound, cleaning (item 4, WP 0174 00)
Semitrailer disconnected from prime mover (refer
Rags (item 11, WP 0174 00)
to WP 0007 00)
Gaskets (3) (item 52, WP 0175 00)
Semitrailer grounded (refer to WP 0007 00)
Lockwashers (48) (item 40, WP 0175 00)
F, E, and B valves removed (refer to WP 0132 00)
Packings (3) (item 51, WP 0175 00)
NOTE
Use this task to repair the F, E, and B valves. The F valve
is shown.
0166 00-1
|
||