Custom Search
 
  
 


TM 9-2330-330-14&P
FLANGE AND PIPING MANIFOLDS, HANDWHEELS, AND
F, E, AND B VALVES REPLACEMENT
THIS WP COVERS:
Valve Removal, Valve Installation, Handwheel Removal, Handwheel Installation, Follow-On Task
INITIAL SETUP:
Maintenance Level
Tools and Special Tools
Organizational
Tool kit, general mechanic's (item 4, WP 0171 00)
Suitable container (item 1, WP 0171 00)
Materials/Parts
Gaskets (7) (item 80, WP 0175 00)
Equipment Conditions
Self-locking nuts (48) (item 87, WP 0175 00)
Semitrailer disconnected from prime mover (refer to
Semitrailer grounded (refer to WP 0007 00)
Fuel tank drained (refer to WP 0007 00)
NOTE
Use this task to replace F, E, and B valves and handwheel.
F valve and handwheel is shown.
VALVE REMOVAL
Remove 16 screws (3), self-locking nuts (1), washers (2), 2 gaskets (5), and F valve (6) from piping (4).
Discard self-locking nuts and gaskets.
VALVE INSTALLATION
Install F valve (6) and 2 new gaskets (5) on piping (4) with 16 screws (3), new self-locking nuts (1), and
washers (2).
0132 00-1



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business