Tweet |
Custom Search
|
|
|
||
TM 9-2330-330-14&P
PIPING FRAME ASSEMBLY REPLACEMENT--Continued
0163 00
2.
Install 26 bolts (12), 52 washers (11), 26 new self-locking nuts (10), and both sides of piping frame
(4) to semitrailer.
3.
Install three bolts (6), six washers (7), and three new self-locking nuts (8) to panel (9).
FOLLOW-ON TASKS
1.
Install main wiring harness (WP 0057 00).
2.
Install emergency valve A control handle (WP 0139 00).
3.
Install bottom loading valve (WP 0134 00).
4.
Install valve G (WP 0128 00).
5.
Install discharge manifold valve (WP 0133 00).
6.
Install manifold valve (WP 0135 00).
7.
Disconnect semitrailer grounding cables (WP 0007 00).
END OF TASK
0163 00-3/4 blank
|
||