Tweet |
Custom Search
|
|
|
||
TM 9-2330-330-14&P
BOTTOM LOADING VALVE REPLACEMENT
THIS WP COVERS:
Removal, Installation, Follow-On Task
INITIAL SETUP:
Maintenance Level
Tools and Special Tools
Organizational
Tool kit, general mechanic's (item 4, WP 0171 00)
Materials/Parts
Equipment Conditions
Gasket (item 80, WP 0175 00)
Semitrailer disconnected from prime mover (refer
Self-locking nuts (8) (item 92, WP 0175 00)
to WP 0007 00)
Semitrailer grounded (refer to WP 0007 00)
Semitrailer fuel tank drained (refer to WP 0007 00)
REMOVAL
Roadside Bottom Loading Valve
Remove six screws (2) and bottom loading valve (1) from pipe (3).
0134 00-1
|
||