Custom Search
 
  
 


TM 9-2330-330-14&P
MANIFOLD VALVE REPLACEMENT
THIS WP COVERS:
Removal, Installation, Follow-On Tasks
INITIAL SETUP:
Maintenance Level
Tools and Special Tools
Organizational
Tool kit, general mechanic's (item 4, WP 0171 00)
Materials/Parts
Equipment Conditions
Seals (2) (item 129, WP 0175 00)
Semitrailer disconnected from prime mover (refer
Self-locking nuts (2) (item 90, WP 0175 00)
Semitrailer grounded (refer to WP 0007 00)
Semitrailer fuel tank drained (refer to WP 0007 00)
Negative terminal disconnected from battery (refer
G valve removed (refer to WP 0128 00)
J valve removed (refer to WP 0137 00)
REMOVAL
1.
Remove four nuts (7), bolts (6), two split couplings (4), and seals (5) from two pipes (8). Discard
seals.
2.
Remove two self-locking nuts (2), washers (1), bolts (3), and manifold valve (9) from frame (10).
Discard self-locking nuts.
0135 00-1



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business