Custom Search
 
  
 


TM 9-2330-330-14&P
P AND R VALVES REPLACEMENT--Continued
0129 00
INSTALLATION
1.
Install valve (6), 2 new seals (5), 6 bolts (4), 12 washers (3), and 6 new self-locking nuts (2).
2.
Install pipe (7), new gasket (10), four new lockwashers (8), and nuts (9) to meter (1).
FOLLOW-ON TASKS
1.
Reconnect negative battery terminal (WP 0007 00).
2.
Disconnect semitrailer grounding cables (WP 0007 00).
END OF TASK
0129 00-2



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business