TM 9-2330-330-14&P
OPERATION UNDER USUAL CONDITIONS--Continued
4.
SELF-LOADING OPERATIONS
CAUTION
Remove vent cap from either side of vapor recovery
tube to vent tank during pumping operations.
NOTE
Operations begin and end with all valves closed.
0007 00-17