Tweet |
Custom Search
|
|
|
||
TM 9-2330-330-14&P
f.
At end of operation close all valves.
g. Drain 4-in. hose (2) into suitable container.
h. Remove and store hose (2) in hose tube (3).
i.
Close vapor recovery system caps.
j.
Remove grounding and bonding cables.
k.
Store and cover fire extinguishers (1).
OPERATION UNDER USUAL CONDITIONS--Continued
Gravity Unload Flow Chart
0007 00-16
|
||