Tweet |
Custom Search
|
|
|
||
TM 9-2330-329-14&P
PIPING FRAME ASSEMBLY REPLACEMENT
THIS WP COVERS:
Removal, Installation, Follow-On Tasks
INITIAL SETUP:
Maintenance Level
Equipment Conditions
Direct and General Support
Semitrailer disconnected from prime mover (refer
to WP 0007 00)
Semitrailer grounded (refer to WP 0007 00)
Materials/Parts
Manifold valve removed (refer to WP 0124 00)
Self-locking nuts (26) (item 86, WP 0160 00)
Discharge manifold valve removed (refer to
Self-locking nuts (11) (item 87, WP 0160 00)
G valve removed (refer to WP 0118 00)
Personnel Required
Bottom loading valve removed (refer to
Two
Emergency valve A control handle removed (refer
to WP 0126 00)
Tools and Special Tools
Main wiring harness removed (refer to
Tool kit, general mechanic's (item 4, wp 0156 00)
Static reel removed (refer to WP 0084 00)
F,E, and B valves and handwheels removed
(refer to WP 0121 00)
REMOVAL
1.
Remove 8 self-locking nuts (1), 16 washers (2), 8 bolts (3), and rear of piping frame (4) from
bulkhead (5). Discard self-locking nuts.
WARNING
Piping frame is heavy. Position a forklift or other lifting
device underneath framework. Do not attempt to lift it by
yourself or damage to equipment or injury to personnel
could result.
0147 00-1
|
||