Tweet |
Custom Search
|
|
|
||
TM 9-2330-329-14&P
GROUNDING ROD STORAGE TUBE RETAINING PIN REPLACEMENT
THIS WP COVERS:
Removal, Installation, Follow-On Task
INITIAL SETUP:
Maintenance Level
Tools and Special Tools
Organizational
Tool kit, general mechanic's (item 4, WP 0156 00)
Materials/Parts
Equipment Conditions
Retaining pin (item 99, WP 0160 00)
Semitrailer disconnected from prime mover (refer
Retaining wire (item 67, WP 0160 00)
to WP 0007 00)
Semitrailer grounded (refer to WP 0007 00)
REMOVAL
1.
Remove retaining pin (2) from grounding rod storage tube (1).
2.
Remove retaining wire (3) from support post (4). Discard pin and retaining wire.
0086 00-1
|
||