Tweet |
Custom Search
|
|
|
||
TM 9-2330-329-14&P
TOOL BOX REPLACEMENT--Continued
0085 00
2.
Install tool box (5), 11 bolts (9), 22 washers (8), and 11 new self-locking nuts (7) to front skid plate
(10) and piping frame (6).
3.
Install bolt (3), two washers (2), and new self-locking nut (1) to manifold (4).
FOLLOW-ON TASK
Disconnect semitrailer grounding cables (WP 0007 00).
END OF TASK
0085 00-3/4 blank
|
||