Custom Search
 
  
 


TM 9-2330-329-14&P
TOOL BOX REPLACEMENT--Continued
0085 00
2.
Remove 11 self-locking nuts (7), 22 washers (8), 11 bolts (9), and tool box (5) from between front
skid plate (10) and piping frame (6). Discard self-locking nuts.
3.
Remove six pop rivets (12) and operating instruction plate (11) from tool box (5). Discard pop
rivets.
INSTALLATION
1.
Install operating instruction plate (11) and six new pop rivets (12) to tool box (5).
0085 00-2



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business