Custom Search
 
  
 


TM 9-2330-329-14&P
AIR BRAKE HOSES MAINTENANCE
THIS WP COVERS:
Removal, Installation, Test, Follow-On Task
INITIAL SETUP:
Maintenance Level
Tools and Special Tools
Organizational
Tool kit, general mechanic's (item 4, WP 0156 00)
Materials/Parts
Equipment Conditions
Compound, thread sealing (item 7, WP 0159 00)
Semitrailer disconnected from prime mover (refer
Cable ties (AR) (item 98, WP 0160 00)
Semitrailer grounded (refer to WP 0007 00)
References
Air reservoir drained (refer to WP 0007 00)
REMOVAL
NOTE
There are two sets of air brake hoses and they are
replaced the same way. This procedure replaces
the set from the semitrailer trailing axle.
Remove and discard cable ties as necessary.
1.
Disconnect three brake hoses (2) from air brake chamber fittings (3).
2.
Remove three brake hoses (2) from airline mounting plate fittings (1).
0074 00-1



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business