Custom Search
 
  
 


TM 9-2330-329-14&P
SPRING BRAKE CONTROL VALVE MAINTENANCE
THIS WP COVERS:
Removal, Installation, Test, Follow-On Task
INITIAL SETUP:
Maintenance Level
Tools and Special Tools
Organizational
Tool kit, general mechanic's (item 4, WP 0156 00)
Materials/Parts
Equipment Conditions
Compound, thread sealing (item 7, WP 0159 00)
Semitrailer disconnected from prime mover (refer
References
Semitrailer grounded (refer to WP 0007 00)
Air reservoir drained (refer to WP 0007 00)
REMOVAL
1.
Tag and disconnect four air lines (1) at spring brake control valve (2) (refer to WP0073 00).
2.
Remove valve (2) from air reservoir fitting (3).
3.
Remove four fittings from valve (2).
0071 00-1



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business