Tweet |
Custom Search
|
|
|
||
TM 9-2330-326-14&P
This Task Covers:
a. Removal
b. Installation
c. Follow-On Tasks
d. Service (Monthly)
Initial Setup:
Tools and Special Tools:
Materials:
Tool kit, general mechanic's (Item 4, Appendix B-3)
Oil, lubricating (Item 9, Appendix F)
Equipment Conditions:
References:
Landing legs down
Semitrailer disconnected from prime mover
Tires chocked
TM 9-237
Ground boards emplaced
TB 9-2510-242-10
CAUTION
U
Insure lock pockets are clean and all debris removed.
NOTE
Make sure twistlock pocket is clean and free of debris.
Item 3, socket (cup) is welded in. This task is accomplished at
Direct Support.
There are eight retractable twist locks and they are removed
and installed the same way. This procedure covers one
retractable twist lock.
See Paragraph 6-1 for additional service requirements.
General Procedure:
a. Removal.
Remove pin (5), handle with twistlock (2). Discard pin.
b. Installation.
Install handle with twistlock (2 and new pin (5).
|
||