TM 9-2330-326-14&P
c.
Follow -On Tasks.
1.
Lubricate twistlock assembly with 10 wt. oil.
2.
Make sure twistlock operates freely with no binding.
3.
Connect semitrailer to prime mover.
4.
Raise landing legs.
5.
Remove/store chocks and ground boards.
6-60