Custom Search
 
  
 


TM 9-2330-326-14&P
6-2. BLACKOUT LIGHTS REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
c. Follow-On Tasks
Initial Setup:
Tools and Special Tools:
Materials:
Tool kit, general mechanic's (Item 4, Appendix B-3)
Dielectric grease (Item 34, Appendix F)
Equipment Conditions:
References:
Landing legs down
Semitrailer disconnected from prime mover
Electrical Schematic, Section 6, Page 6-6
Tires chocked
Ground boards emplaced
WARNING
Disconnect all electrical power before performing any maintenance
on the electrical system. Failure to do so could result in injury to
personnel.
NOTE
Right and left blackout lights are removed and installed the
same way. This procedure covers one blackout light.
For detailed procedures and/or information, see referenced "H"
Section.
General Procedure:
a. Removal.
1.
Disconnect two connectors.
2.
Remove two nuts (3), two lockwashers (2), and blackout light (1). Discard lockwashers.



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business