Custom Search
 
  
 


TM 9-2330-326-14&P
General Procedure (Cont.):
b. Installation.
1.
Install blackout light (1), two new lockwashers (2), and two nuts (3).
2.
Apply dielectric grease on pins and then connect two connectors.
c.
Follow -On Tasks.
1.
Connect semitrailer to prime mover.
2.
Raise landing legs.
3.
Remove/store chocks and ground boards.
4.
Connect power source and check to see if operational.
6-8



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business