Custom Search
 
  
 


TM 9-2320-279-10-3
Operation Under Usual Conditions (Cont)
1
tfft00287 P
2
3
4
(24) Turn foam METERING VALVE (1) to closed position.
NOTE
Make sure PUMP COOLER switch is in OFF position.
(25) Refill foam agent storage tank to one-half full level in expansion dome
with appropriate foam agent (para 2-122).
(26) Return all valves and switches to their normal standby position
(para 2-111 or 2-123).
2-175



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business