Tweet |
Custom Search
|
|
|
||
TB 9-2330-330-14&P-1
FOLLOW-ON TASK (continued)
5. Install two brackets (12) on semitrailer with sixteen flat washers (163), eight capscrews (162),
and eight new self-locking nuts (165). Torque self-locking nuts to 30-35 lb-ft (41-48 Nm).
6. Insert ground rod (13) into ground rod storage tube (14) and secure with retaining pin (15).
7. Install cross assembly (24), with pipe (23) attached, on semitrailer with seal (17), split-pipe
couplings (26), two capscrews (16) and two nuts (25).
8. Install pipe (20) on cross assembly (24) with seal (18), split-pipe couplings (21), two
capscrews (19), and two nuts (22).
3-32
|
||