TB 9-2330-330-14&P-1
FOLLOW-ON TASK (continued)
3. Position two handrails (7) on platform support (9) and secure using two retaining pins (6), four
new flat washers (163), two capscrews (8), and two new self-locking nuts (165). Torque
self-locking nuts to 30-35 lb-ft (41-48 Nm).
4. Install ladder (10) on semitrailer with four new flat washers (163), two capscrews (11), and two
new self-locking nuts (165). Do not fully tighten hardware.
3-31
|
||