Tweet |
Custom Search
|
|
|
||
TB 9-2330-330-14&P-1
INITIAL INSTALLATION (continued)
NOTE
An assistant will help with Steps 11 and 12.
11. Install two hose tubes (16) on tube canister brackets (172) and secure in place with three
retaining straps (14), six flat washers (163), three capscrews (17), and three self-locking
nuts (165). Torque self-locking nuts to 30-35 lb-ft (41-48 Nm).
12. Install retaining strap (12) on two hose tubes (16) and tube canister bracket (172) with two flat
washers (163), capscrew (17), and self-locking nut (165). Torque self-locking nut
to 30-35 lb-ft (41-48 Nm).
13. Install side marker light box (18) on hose tube (16) with two retaining straps (20), four
J-bolts (19), four self-locking nuts (165), and four flat washers (163).
3-25
|
||