Custom Search
 
  
 


TB 9-2330-330-14&P-1
VEHICLE PREPARATION (continued)
8. Remove two hoses from curbside hose tubes, refer to TM 9-2330-330-14&P. Set hoses aside
for reinstallation.
9. Remove self-locking nut (10), capscrew (14), two washers (11), and retaining strap (13) from
mounting bracket (12). Discard hardware.
10. Remove four self-locking nuts (17), four flat washers (16), four J-bolts (18), two retaining straps
(20), and side marker light box (15) from hose tube (19). Discard nuts.
NOTE
An assistant will help with Step 11.
11. Remove three self-locking nuts (24), six washers (22), three capscrews (21), three retaining
straps (25), and two curbside hose tubes (19) from three mounting brackets (23) from
semitrailer. Discard hardware.
3-4



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business