Custom Search
 
  
 


TM 9-2330-326-14&P
Table 4-1. Unit PMCS.
ITEM
INTERVAL
ITEM TO
EQUIPMENT
NO.
M
S
A
T
MI
CHECK/
PROCEDURE
NOT READY/
SERVICE
AVAILABLE IF:
NOTE
Perform  Operator/Crew  PMCS
prior to, or in conjunction with,
Unit PMCS if there is a delay
between daily operation of the
equipment and the Unit PMCS or
regular
operator
is
not
assisting/participating.
Clean  axle  and  suspension
system with low -pressure water
and  fiber  brush  to  allow for
careful inspection.
1
M
S
A
T
MI
Suspensio Torque suspension nuts to the following in-
Torque service
First
n Initial
service dry torque values:
requirements/sc
?
1,000
Torque
hedule are not
1-1/8"-12 UNF
880 lb-ft (1193 Nm)
met. NMC if
3/4"-16 UNF
300 lb-ft (407 Nm)
nuts, bolts, are
5/8"-18 UNF
180 lb-ft (244 Nm)
damaged.
NOTE
New
replacement
installations/
hardware should have wet (oiled)
fasteners. The following wet torque
values apply:
1-1/8"-12 UNF
670 lb-ft (908 Nm)
3/4"-16 UNF
220 lb-ft (298 Nm)
5/8"-18 UNF
130 lb-ft (176 Nm)
4-3



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business