Custom Search
 
  
 


TM 9-2330-380-14&P
5-17. Leveling Jack Repair
This task covers:
a. Removal
b. Cleaningandinspection
c. Repair
d. Installation
Initial Setup:
Tools/Test Equipment:
EquipmentConditions:
Leveling jack removed (para. 4-58).
Materials/Supplies:
Brush (item 15, Appendix E)
Upper bracket chain (Appendix G)
Lower bracket chain (Appendix G)
Bracket (Appendix G)
a. Removal
NOTE
For ease of installation, mark position of chains and bracket prior to removal.
1. Mark position and remove upper bracket chain (1).
2. Mark position and remove lower bracket chain (2).
b. Cleaning and inspection
1. Clean parts with brush and water.
2. Inspect for dents, warps, cracks, rust, corrosion or marred
paint. Repair or replace defective parts.
c. Repair
3
1
1. Fabricate new brace (3) in accordance with instructions in
2
2. Fabricate new chains in accordance with instructions in
d. Installation
NOTE
Weld in accordance with TM 9-237.
1. Position and weld lower bracket chain (2).
2. Position and weld upper bracket chain (1).
Follow-on maintenance:
Install leveling jack (para.4-58).



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business