Tweet |
Custom Search
|
|
|
||
TM 9-2330-380-14&P
This task covers:
a. Removal
b. Cleaningandinspection
c. Repair
d. Installation
Initial Setup:
Tools/Test Equipment:
EquipmentConditions:
Landing leg removed (para. 4-58).
Materials/Supplies:
Channel Bracket (Appendix G)
a. Removal
NOTE
For ease of installation, mark position of channel bracket on landing gear brace prior
to removal.
1. Mark position and remove channel bracket (1) from mounting
plate.
2. Mark position and remove channel bracket (2) from landing
leg.
b. Cleaning and inspection
1. Clean parts with brush and water.
2. Inspect for dents, warps, cracks, rust, corrosion or marred
1
paint. Repair or replace defective parts.
c. Repair
1. Fabricate new channel brackets in accordance with instructions
in Appendix G.
2. Fabricate new channels in accordance with instructions in
2
d. Installation
NOTE
Weld in accordance with TM 9-237.
1. Position and weld new channel bracket (1) onto mounting
plate.
2. Position and weld new channel bracket (2) onto landing leg.
Follow-on maintenance:
Install landing leg (para.4-58).
|
||