Tweet |
Custom Search
|
|
|
||
TM 9-2330-380-14&P
This task covers:
a. Removal
b.
Installation
Initial Setup:
Tools/Test Equipment:
EquipmentConditions:
General mechanic's tool kit (item 01, Appendix B)
1
Materials/Supplies:
a. Removal
1. Lift and slide off cover (1).
2. Remove four blind rivets (2) and box (3).
2
b. Installation
1. Position box (3) and secure with four blind rivets (2).
2. Slide cover (1) into position.
2
3
Follow-on maintenance: None
Remove/install dolly assembly in accordance with instructions on para. 4-92.
|
||