Custom Search
 
  
 


TM 9-2330-380-14&P
4-32. Toggle Switch and Backwall Receptacle Replacement (M129A4 Only)
This task covers:
a. Removal
b. Installation
Initial Setup:
Tools/Test Equipment:
EquipmentConditions:
General mechanic's tool kit (item 01, Appendix B)
Power source disconnected.
WARNING
Make sure all electrical power is disconnected before performing any maintenance on the electrical
system. Serious injury or death may result if proper precautions are not taken.
NOTE
All toggle switches are removed/installed in the same manner. Bottom toggle switch is shown.
a. Removal
1. Remove screw (2) and wall plate (1).
8
2. Remove two screws (3) from connector (4).
7
6
3. Tag and disconnect wires. Remove connector (4).
5
4. Remove two screws (5) and electrical cover (6).
5. Remove two screws (7) from toggle switch (8).
6. Tag and disconnect wires. Remove toggle switch (8).
3
b. Installation
2
1. Connect wires. Position connector (4) and secure with
4
two screws (3).
2. Install electrical wall plate (1) and screw (2).
1
3. Connect wires. Position toggle switch (8) and secure with two screws (7).
4. Install electrical cover (6) and two screws (5).
Follow-on maintenance: None



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business