Custom Search
 
  
 


TM 9-2330-380-14&P
Section II. OPERATOR/CREW MAINTENANCE PROCEDURES
Paragraph
Page
Number
ParagraphTitle
Number
Wheel and Tire ................................................................................................................. 3-9
3-4. Wheel and Tire
This task covers:
a. Removal
b. Installation
Initial Setup:
Tools/Test Equipment:
EquipmentConditions:
Wheelnutwrench
Brakes applied.
Jack
Personnel Required:
Two
Materials/Supplies:
WARNING
Tire is heavy. Two persons are required to remove/install tire.
a. Removal
1. Apply brakes to semitrailer. If semitrailer is attached to towing vehicle, wheels may be locked by
disconnecting the emergency air connections.
NOTE
Outer cap nuts on right side (marked R) have right hand threads and those on the left (marked L)
have left hand threads. Nuts must be turned in opposite direction to normal
forward rotation of wheel to be loosened or removed.
2. Loosen ten outer wheel nuts (1), using wheel nut wrench (2)
3. Jack up semitrailer axle until wheel clears the ground.
4. Remove wheel nuts and wheel.
NOTE
Perform steps 5 through 7 to remove inner wheel.
5. Loosen ten inner wheel nuts (1), using wheel nut wrench (2).
6. Jack up semitrailer axle until wheel clears the ground.
7. Remove wheel nuts and wheel.



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business