Tweet |
Custom Search
|
|
|
||
TM 9-2330-331-14&P
CONTAINER GUIDE ASSEMBLY REPLACEMENT
INITIAL SETUP:
Equipment Conditions
Materials/Parts
Ground Boards Emplaced
Locknut (WP 0080 00-23)
Landing Legs Down
Pushnut (WP 0080 00-23)
Tires Chocked
Lock Washer (WP 0080 00-23)
Semitrailer Disconnected from Prime Mover
Locknut (WP 0080 00-23)
Tools/Test Equipment
General Mechanic's Tool Kit (WP 0077 00-9)
NOTE
There are two container guide assemblies that are replaced using the same
procedures. Procedures are for one container guide assembly.
CONTAINER GUIDE REMOVAL
1. Remove locknut (9), washers (8), and screw (7) from pin (2). Discard locknut.
2. Remove pin (2) from container guide (1).
3. Remove container guide (1).
1
1
2
9
14
12
13
15
6
12
8
3
7 5
11
4
10
Figure 1. Container Guide
|
||