TM 9-2330-331-14&P
0045 00
AIR RESERVOIRS REPLACEMENT - Continued
FOLLOW-ON TASKS
Install spring valve (WP 0043 00-3).
Connect semitrailer to prime mover.
Remove tire chocks.
Raise landing legs.
Remove/store ground boards.
Pressurize system.
Check for air leaks (WP 0044 00-1).
Verify proper/safe operation.
END OF WORK PACKAGE
0045 00-3/4 Blank
|
||