Custom Search
 
  
 


TM 9-2330-331-14&P
0042 00
AIR BRAKE CHAMBERS REPLACEMENT - Continued
INSTALLATION
1. Treat all threads with sealing compound (sealant, silicone).
2. Install adapters (3) and elbows (2) on brake chamber (1).
3. Install jamnut (4) and yoke (universal joint, vehicular) (6) on air brake chamber (1) the distance measured
from the face of the old chamber to the jamnut per WP 0042 00-2, Step 7.
4. Install air brake chamber (1), two washers (9), and new locknuts (8).
5. Install air lines.
6. Line up yoke (universal joint, vehicular) (6) with slack adjuster and install straight pin (5).
7. Install new cotter pin (7) into straight pin (5).
NOTE
Step 8 is only required if brakes are caged.
8. Uncage brakes according to WP 0007 00-15.
FOLLOW-ON TASKS
Adjust brakes according to WP 0038 00-4.
Connect semitrailer to prime mover.
Remove tire chocks.
Raise landing legs.
Remove/store ground boards.
Pressurize system.
Check system for air leaks.
Verify proper/safe operation.
END OF WORK PACKAGE
0042 00-3/4 Blank



 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business